ontario line toronto

Toronto's next iconic bridge just started construction

Construction on Toronto's upcoming Lower Don Bridge has officially begun, which will eventually carry the under-construction Ontario Line over the Don River between Corktown and Riverside. 

To prepare the site for the start of construction, Metrolinx crews cleared the area, relocated a watermain that went beneath the railway, and shifted the train tracks throughout 2023. 

The tracks had to be shifted to make it possible for continued GO service during the Ontario Line construction since the future subway line will run alongside GO Trains in the shared rail corridor in the area. 

Construction on the bridge's east support structure is starting with the installation of two concrete and steel piers that will support the foundation of the bridge. 

Once the east support structure is completed, Metrolinx will move onto the west side. The forthcoming bridge will be built north of the existing Lower Don Bridge over the Don Valley Parkway and the Don River. 

The Ontario Line is set to bring 15 new stations to Toronto along a 15.6-kilometre subway line running from Exhibition Place, through the downtown core, up to the Ontario Science Centre. 

Construction for the rapid transit line is expected to be completed by 2031. 

Lead photo by

Metrolinx


Latest Videos



Latest Videos


Join the conversation Load comments

Latest in City

Here are all the 2025 statutory holidays in Canada

Huge stretch of TTC subway spanning 11 stations closed for the next 2 weekends

Most people in Toronto now think that the city is moving in the wrong direction

11 million Canada Post parcels now undelivered ahead of Black Friday

Busy Toronto street kicks off major makeover set to wrap in 2025

Here's how much money you could save during Canada's GST holiday

Huge changes planned to 'transform' a major Toronto street

Canadians working in certain fields can expect a big pay bump in 2025